9 June, 2003
Christos Zamantzas
2
Functional Specifications
lPOST-MORTEM ANALYSIS  (chap. 6.9 & 9.8)
l
lIn case of a beam dump, the BLM system should help answering the following questions:
èis the beam dumping clean or were there unexpected losses around the machine?
èwhat is the cause of the dump action: beam losses triggering the BLM or internal magnet quench protection interlocks? Other machine interlocks without prior beam losses?
lThe signals of all monitors should be buffered for the last 100 - 1000 turns, such that they can be read out and analysed after a beam-dump. In addition, the average rates of all monitors should be easily available for time scales of a few seconds and 10 minutes before a beam-dump.
12/03/03: LHC-BLM-ES-001.00