| LHC BLM threshold modification reports |
Talks presented at the Machine Protection WG
Date |
Topic | Remarks |
14/06/2002 | Design of the LHC Beam Loss Monitor, slides (E. Gschwendtner) | |
14/02/2003 | Beam Loss Monitor system availability, slides (G. Guaglio) | |
23/04/2004 | Location of BLMs in the LHC and BLM signals in the control room, slides. (E.B. Holzer) | |
28/05/2004 | LHC Beam Loss Monitors - Design of the digital electronics, slides (C. Zamantzas) | |
25/06/2004 | BLM interlock follow up, slides (B. Dehning) | |
12/04/2005 | Beam loss monitoring requirements and system description, slides (B. Dehning) | |
12/04/2005 | Beam loss monitors - Realisation, slides (C. Zamantzas) | |
17/03/2006 | Beam Loss Monitor electronics and Beam Dump Thresholds slides (C. Zamantzas) | |
02/11/2007 |
Measurements and Simulations for the LHC BLM System at the HERA Proton
Beam Dump, slides (M. Stockner)
|
|
30/09/2011 |
Firmware_upgrade, slides (C. Zamatzas) |
|