Talks and Papers
BLM Internal Review (17,19, and 23 February 2004)
Date |
Topic |
Remarks |
12/01 |
||
05/02 |
||
14/02/2003 |
BLM
Dependability 1 [pdf] (Gianluca
Guaglio) |
Preliminary Reliability Considerations |
18/03/2003 |
BLM Threshold Comparator
[pdf] (Christos
Zamantzas) |
Preliminary Design Considerations |
08/04/2003 |
BLMlasermarket01o.pdf
(Gianluca Guaglio) |
Transmitter/Receiver first market survey |
10/06/2003 |
BLMTC
Post Mortem & Memory Requirements [pdf]
(Christos Zamantzas) |
Still to be checked for consistency. For more
info check LHC
Post-Mortem Home Page |
12/08/2003 |
BLM Threshold
Comparator [pdf]
(Christos Zamantzas) |
Latest TC design & Memory calculations. |
23/09/2003 |
BLM Design
Issues [pdf]
(Christos Zamantzas) |
Storage of Th values,
Beam energy, Status bits, Identification and installation procedures. |
21/10/2003 |
BLM_031021 (Gianluca Guaglio) |
H6 and Louvain measurements. |
21/10/2003 |
Design strategy for log and PM data. |
|
19/11/2003 |
Beam
Loss Monitors (E.B. Holzer for the BLM team) |
AB-LTC Technical Review |
22/02/2004 |
The Beam Loss Monitoring System(B. Dehning for the BLM
team)Paper, Talk |
Chamonix talk on the commissioning and running in of the
system + SPS test results and collimation features |
02/2004 |
Section review meeting. Dependability + irrradiations. Slides |
Guaglio's speeches on Dependability
of BLM, Radiation test on analog part, poposed test
on analog electronic, dump levels approximations. |
05/2004 |
BIW2004 (Gianluca Guaglio) |
Contribution to the Beam Instrumentation Workshop: Paper and Slides |
09/07/2002 |
LEADE (B.
Dehning) |
Working group talk |
14/06/2004 |
LEADE (B.
Dehning |
Working group talk |
20/11/2003 |
Specification
comments (D. Dehning) |
BI TB |
07/2004 |
Longitudinal Loss
Distribution, paper, poster. (E.B. Holzer, B. Dehning) |
EPAC 04 |
07/2004 |
Design of the BLM System for
the LHC, paper, poster. (E.B. Holzer et al.) |
EPAC 04 |
07/2004 |
Beam Loss Monitoring System, slides. (E.B. Holzer) |
External Review of LHC Collimation Project |
07/2004 |
Beam Loss Monitors for the LHC, slides. (E.B. Holzer) |
LHC Specification Committee |
10/2004 |
ICFA2004 (G. Guaglio) |
Contribution to the ICFA-HB2004 workshop: Article and Slides |
11/2004 |
Radiation day 2004, CERN, (B.Dehning)
(slides) |
LHC BLM system |
03/2005 |
Quench level work shop, CERN, (B.Dehning)
(slides) |
LHC BLM system |
04/2005 |
Machine protection review, CERN, (B.Dehning)
(slides),
(recommendation, slides, paper) |
LHC BLM system |
07/2005 |
LHC BLM system |
|
06/2005 |
RELIABILITY ASSESSMENT OF THE LHC MACHINE PROTECTION
SYSTEM |
|
10/2005 |
Beam Loss Monitoring System for the LHC, E.B. Holzer et
al. (presentation, paper) |
IEEE NSS 2005 |
29/12/05 |
Radiation Day CERN, B. Dehning (ppt) |
LHC Beam
Loss System (HERA dump) |
14/12/05 |
Interpretation
and Use of BLM Data, LTC (ppt) |
|
16/12/05 |
PhD Gianluca Guaglio (Presentation.ppt, Thesis.pdf) |
BLMS Dependability |
05/02/06 |
BLM commissioning |
|
06/02/06 |
Chamonix VX, 2006 BI , E,B, Holzer
(presentation, paper) |
Group Commitments and Major Issues
for Distributed Systems |
06/04/06 |
AB seminar, Reliability study of the BLM system, (pdf) |
G. Guaglio |
11/05/06 |
APC, Sensitivity tests of BLM-S chamber in PSB dump (presentation) |
|
01/06/06 |
ICFA Tsukuba 2006, E,B, Holzer (presentation, paper) |
Commissioning and operational scenarios of LHC BLM
system |
17/09/06 |
OEPG-FAKT
2006, M. Stockner (presentation) (german) |
Messungen
und Simulationen für das Strahlverlust-Monitor-System des LHC |
05/10/06 |
Siena
IPRD06, D. Kramer (presentation,
paper) |
Simulations & beam tests of SEM (BLMS) |
30/10/06 |
Measurements and Simulations of Ionization Chamber Signals in Mixed Radiation Fields for the LHC BLM System |
|
7/12/06 |
MAC, R. Jones (pdf) |
Status on beam instrumentation (status BLM) |
23/5/07 |
Classification of the LHC BLM ionization chamber |
|
18/10/07 |
CLIC workshop, E.B. Holzer (presentation) |
Protection system: Lessons learnt from LHC |
2/11/07 |
IEEE NSS 2007, D.Kramer (presentation, paper) |
Very High Radiation Detector for the LHC BLM System
Based on Secondary Electron Emission |
2/11/07 |
IEEE NSS 2007, C.Zamantzas
(presentation, paper) |
The LHC Beam Loss Monitoring
System's Data Contribution to other Systems |
2/11/07 |
Accuracy of LHC proton loss rate
determination by the BLM system |
|
15/11/07 |
BI TB, V. Prieto (ppt) |
PS test
measurements with IC |
Talks presented at the LHC Machine Protection Working Group.