Talks and Papers
BLM Internal Review (17,19, and 23 February 2004)
Date |
Topic | Remarks |
12/01 | Project thesis CFC (W. Friesenbichler) [doc] | |
05/02 | Diplom thesis CFC (W. Friesenbichler) [pdf.gz] | |
14/02/2003 | BLM Dependability 1 [pdf] (Gianluca Guaglio) | Preliminary Reliability Considerations |
18/03/2003 |
BLM Threshold Comparator [pdf] (Christos Zamantzas) | Preliminary Design Considerations |
08/04/2003 | BLMlasermarket01o.pdf (Gianluca Guaglio) | Transmitter/Receiver first market survey |
10/06/2003 |
BLMTC Post Mortem & Memory Requirements [pdf] (Christos Zamantzas) | Still to be checked for consistency. For more info check LHC Post-Mortem Home Page |
12/08/2003 | BLM Threshold Comparator [pdf] (Christos Zamantzas) | Latest TC design & Memory calculations. |
23/09/2003 | BLM Design Issues [pdf] (Christos Zamantzas) | Storage of Th values, Beam energy, Status bits, Identification and installation procedures. |
21/10/2003 | BLM_031021 (Gianluca Guaglio) | H6 and Louvain measurements. |
21/10/2003 | BLMTC Logging & Post Mortem [pdf] (CZ) | Design strategy for log and PM data. |
19/11/2003 | Beam Loss Monitors (E.B. Holzer for the BLM team) | AB-LTC Technical Review |
22/02/2004 | The Beam Loss Monitoring System(B. Dehning for the BLM team)Paper, Talk | Chamonix talk on the commissioning and running in of the system + SPS test results and collimation features |
02/2004 | Section review meeting. Dependability + irrradiations. Slides | Guaglio's speeches on Dependability of BLM, Radiation test on analog part, poposed test on analog electronic, dump levels approximations. |
05/2004 | BIW2004 (Gianluca Guaglio) | Contribution to the Beam Instrumentation Workshop: Paper and Slides |
09/07/2002 | LEADE (B. Dehning) | Working group talk |
14/06/2004 | LEADE (B. Dehning | Working group talk |
20/11/2003 | Specification comments (D. Dehning) | BI TB |
07/2004 | Longitudinal Loss Distribution, paper, poster. (E.B. Holzer, B. Dehning) | EPAC 04 |
07/2004 | Design of the BLM System for the LHC, paper, poster. (E.B. Holzer et al.) | EPAC 04 |
07/2004 | Beam Loss Monitoring System, slides. (E.B. Holzer) | External Review of LHC Collimation Project |
07/2004 | Beam Loss Monitors for the LHC, slides. (E.B. Holzer) | LHC Specification Committee |
10/2004 | ICFA2004 (G. Guaglio) | Contribution to the ICFA-HB2004 workshop: Article and Slides |
11/2004 | Radiation day 2004, CERN, (B.Dehning) (slides) | LHC BLM system |
03/2005 | Quench level work shop, CERN, (B.Dehning) (slides) | LHC BLM system |
04/2005 | Machine protection review, CERN, (B.Dehning) (slides), (recommendation, slides, paper) | LHC BLM system |
07/2005 | DIPAC, (B.Dehning), (slides, paper) | LHC BLM system |
06/2005 | PAC, R. Filippini at. al, (doc, pdf) | RELIABILITY ASSESSMENT OF THE LHC MACHINE PROTECTION SYSTEM |
10/2005 | Beam Loss Monitoring System for the LHC, E.B. Holzer et al. (presentation, paper) | IEEE NSS 2005 |
29/12/05 | Radiation Day CERN, B. Dehning (ppt) | LHC Beam Loss System (HERA dump) |
14/12/05 | Interpretation and Use of BLM Data, LTC (ppt) | |
16/12/05 | PhD Gianluca Guaglio (Presentation.ppt, Thesis.pdf) | BLMS Dependability |
05/02/06 | Chamonix VX, 2006, B. Dehning, (ppt, paper) | BLM commissioning |
06/02/06 | Chamonix VX, 2006 BI , E,B, Holzer (presentation, paper) | Group Commitments and Major Issues for Distributed Systems |
06/04/06 | AB seminar, Reliability study of the BLM system, (pdf) | G. Guaglio |
01/06/06 | ICFA Tsukuba 2006, E,B, Holzer (presentation, paper) | Commissioning and operational scenarios of LHC BLM system |
17/09/06 | OEPG-FAKT 2006, M. Stockner (presentation) (german) |
Messungen und Simulationen für das Strahlverlust-Monitor-System
des LHC
|
05/10/06 | Siena IPRD06, D. Kramer (presentation, paper) | Simulations & beam tests of SEM (BLMS) |
30/10/06 | IEEE NSS-MIC 2006, M. Stockner (poster, paper), San Diego |
Measurements and Simulations of Ionization Chamber Signals in Mixed Radiation Fields for the LHC BLM System |
7/12/06 | MAC, R. Jones (pdf) | Status on beam instrumentation (status BLM) |
9/3/07 | MPWG, L. Ponce (ppt) | Remote setting of LHC BLM thresholds? |
23/5/07 | DIPAC07, M. Stockner, E.B. Holzer (poster, paper) | Classification of the LHC BLM Ionization Chamber |
June 2007 | PAC 2007, E.B. Holzer (poster, paper) | The LHC Beam Loss Measurement System |
June 2007 | PAC 2007, M. Stockner, D. Kramer. (poster, paper) | LHC Beam Loss Detector Design: Simulations and Measurements |
18/10/07 |
CLIC workshop, E.B. Holzer (presentation) |
Machine Protection system: Lessons learnt from LHC |
2/11/07 | IEEE NSS 2007, D.Kramer (presentation, paper) | Very High Radiation Detector for the LHC BLM System Based on Secondary Electron Emission |
2/11/07 | IEEE NSS 2007, C.Zamantzas (presentation, paper) | The LHC Beam Loss Monitoring System's Data Contribution to other Systems |
2/11/07 | IEEE NSS 2007, E.B. Holzer (poster, paper) | Accuracy of LHC proton loss rate determination by the BLM system |
7/11/07 | L. Ponce (ppt) | Distributed BI Systems |
15/11/07 | BI TB, V. Prieto (ppt) | PS test measurements with IC |
30/1/08 | LTC, L. Ponce (presentation) | Operational scenario of the BLM System |
5/3/08 | LTC extended, L. Ponce (ppt) | Verification of the Beam Loss studies at start-up |
Talks presented at the LHC Machine Protection Working Group.
Talks presented at the LHC Collimation Working Group.