BLM Internal Review (17,19, and 23 February 2004)
Talks presented at the LHC Machine Protection Working Group.
Talks presented at the LHC Collimation Working Group.
Date |
Topic |
Remarks |
12/01 |
Project thesis CFC (W. Friesenbichler) [doc] |
|
05/02 |
Diplom thesis CFC (W. Friesenbichler) [pdf.gz] |
|
14/02/2003 |
BLM Dependability
1 [pdf]
( |
Preliminary Reliability Considerations |
18/03/2003 |
BLM Threshold
Comparator [pdf] ( |
Preliminary Design Considerations |
08/04/2003 |
BLMlasermarket01o.pdf ( |
Transmitter/Receiver first market survey |
10/06/2003 |
BLMTC Post Mortem
& Memory Requirements [pdf] ( |
Still to be checked for consistency. For more info check LHC Post-Mortem Home Page |
12/08/2003 |
BLM Threshold
Comparator [pdf]
( |
Latest TC design & Memory calculations. |
23/09/2003 |
BLM Design Issues [pdf] ( |
Storage of Th values, Beam energy, Status bits, Identification and installation procedures. |
21/10/2003 |
BLM_031021 ( |
H6 and
|
21/10/2003 |
BLMTC Logging & Post Mortem [pdf] (CZ) |
Design strategy for log and PM data. |
19/11/2003 |
Beam Loss Monitors (E.B. Holzer for the BLM team) |
AB-LTC Technical Review |
22/02/2004 |
The Beam Loss Monitoring System(B. Dehning for the BLM team)Paper, Talk |
|
02/2004 |
Section review meeting. Dependability + irrradiations. Slides |
Guaglio's speeches on Dependability of BLM, Radiation test on analog part, poposed test on analog electronic, dump levels approximations. |
05/2004 |
BIW2004 ( |
Contribution to the Beam Instrumentation Workshop: Paper and Slides |
09/07/2002 |
LEADE (B. Dehning) |
Working group talk |
14/06/2004 |
LEADE (B. Dehning |
Working group talk |
20/11/2003 |
Specification comments (D. Dehning) |
BI TB |
07/2004 |
Longitudinal Loss Distribution, paper, poster. (E.B. Holzer, B. Dehning) |
EPAC 04 |
07/2004 |
Design of the BLM System for the LHC, paper, poster. (E.B. Holzer et al.) |
EPAC 04 |
07/2004 |
Beam Loss Monitoring System, slides. (E.B. Holzer) |
External Review of LHC Collimation Project |
07/2004 |
Beam Loss Monitors for the LHC, slides. (E.B. Holzer) |
LHC Specification Committee |
10/2004 |
ICFA2004 (G. Guaglio) |
Contribution to the ICFA-HB2004 workshop: Article and Slides |
11/2004 |
Radiation day 2004, CERN, (B.Dehning) (slides) |
LHC BLM system |
03/2005 |
Quench level work shop, CERN, (B.Dehning) (slides) |
LHC BLM system |
04/2005 |
Machine protection review, CERN, (B.Dehning) (slides), (recommendation, slides, paper) |
LHC BLM system |
05/06/05 |
LHC BLM system |
|
05/06/05 | DIPAC, C. Zamantzas, (poster, paper) | The LHC Beam Loss Monitoring System’s Real–Time Data Analysis Card |
06/2005 |
RELIABILITY ASSESSMENT OF THE LHC MACHINE PROTECTION SYSTEM |
|
10/2005 |
Beam Loss Monitoring System for the LHC, E.B. Holzer et al. (presentation, paper) |
IEEE NSS 2005 |
29/12/05 |
Radiation Day CERN, B. Dehning (ppt) |
LHC Beam Loss System (HERA dump) |
14/12/05 |
Interpretation and Use of BLM Data, LTC (ppt) |
|
16/12/05 |
PhD
|
BLMS Dependability |
05/02/06 |
BLM commissioning |
|
06/02/06 |
Chamonix VX, 2006 BI , E,B, Holzer (presentation, paper) |
Group Commitments and Major Issues for Distributed Systems |
06/04/06 |
AB seminar, Reliability study of the BLM system, (pdf) |
G. Guaglio |
01/06/06 |
ICFA Tsukuba 2006, E,B, Holzer (presentation, paper) |
Commissioning and operational scenarios of LHC BLM system |
1/8/2006 |
Overview Machine Protection, Schmidt et al. [pdf] |
New Journal of Physics 8 (2006) 290 |
17/09/06 |
OEPG-FAKT 2006, M. Stockner (presentation)
(german) |
Messungen und Simulationen für das Strahlverlust-Monitor-System des LHC |
15/09/06 | LECC, E. Effinger (talk, paper) | The LHC beam loss monitoring system’s data acquisition card |
15/09/06 | LECC, J. Emery (poster, paper) | Functional and Linearity Test System for the LHC Beam Loss Monitoring Data Acquisition Card |
15/09/06 | LECC, C.. Zamantzas (poster, paper) |
The LHC Beam Loss Monitoring System’s Surface Building Installation |
05/10/06 |
Siena IPRD06, D. Kramer (presentation, paper) |
Simulations & beam tests of SEM (BLMS) |
30/10/06 |
Measurements and Simulations of Ionization Chamber Signals in Mixed Radiation Fields for the LHC BLM System |
|
30/10/06 |
An FPGA Based Implementation for Real- Time Processing of the LHC Beam Loss Monitoring System’s Data |
|
7/12/06 |
MAC, R. Jones (pdf) |
Status on beam instrumentation (status BLM) |
9/3/07 |
MPWG, L. Ponce (presentation) |
Remote setting of LHC BLM thresholds? |
20/05/07 | DIPAC, E. Effinger (poster (pdf, odp), paper) |
Single Gain Radiation Tolerant LHC Beam Loss Acquisition Card |
23/5/07 |
Classification of the LHC BLM Ionization Chamber |
|
June 2007 |
The LHC Beam Loss Measurement System |
|
June 2007 |
PAC 2007, M. Stockner, D. Kramer. (poster (pdf, odp), paper) |
LHC Beam Loss Detector Design: Simulations and Measurements |
10.2007 |
PhD Thesis, M. Stockner (pdf) |
Beam Loss Calibration Studies for High Energy Proton Accelerators |
18/10/07 |
CLIC workshop, E.B. Holzer (presentation) |
Machine Protection system: Lessons learnt from LHC |
2/11/07 |
IEEE NSS 2007, D.Kramer (presentation, paper) |
Very High Radiation Detector for the LHC BLM System Based on Secondary Electron Emission |
2/11/07 |
IEEE NSS 2007, C.Zamantzas (presentation, paper) |
The LHC Beam Loss Monitoring System's |
2/11/07 |
Accuracy of LHC proton loss rate determination by the BLM system |
|
15/11/07 |
PS test measurements with IC (ppt) |
BI TB, V. Prieto |
30/1/08 |
LTC, L. Ponce (pdf) |
Commissioning of the LHC Beam Loss Monitor System |
02/08 | J. Emerry (presentation) | Combiner and Survey Card |
02/08 | M. Sapinski, (pdf, doc) | Database specification |
5/3/08 |
LTC extended, L. Ponce (presentation) |
|
11/04/2008 |
LHC collimator measurements in the SPS |
|
11/04/2008 |
APC, D. Kramer (pdf) |
BLM electronics tests, and ionisation chamber SEM comparison |
|
|
Balancing safety and availability for an electronic protection system |
05/05/2008 | BIW08, B. Dehning (presentation (pdf, ppt), paper (pdf, doc)) | LHC machine protection |
24/05/2008 | D. Kramer (ppt) | TI8 Injection test |
23/06/2008 | E.B. Holzer et al. (pdf) | Generation of 1.5 Million Beam Loss Monitor Settings |
23/06/2008 | E.B. Holzer et al. (pdf) | Development, Production and Testing of 4500 Beam Loss Monitors |
10//09/2008 | D. Kramer (PhD. Thesis pdf) | Design and Implementation of a High Flux Mixed Radiation Field Detector |
23/09/2008 | T. Boehlen (pdf) | Thesis: Beam Loss Patterns at the LHC Collimators |
11/2008 | T. Boehlen (pdf) | Draft: Talk Beam Loss Patterns at the LHC Collimators |
01/2009 | B. Roderik, D. Bocian (ppt) | Bound Free Pair Production, ion, quench at LHC |