dehning dehning 4 8 2008-04-11T12:31:00Z 2008-04-19T14:43:00Z 3 1372 7825 CERN 65 18 9179 11.9999

LHC BLM System


BLM Internal Review (17,19, and 23 February 2004) 

Talks presented at the LHC Machine Protection Working Group.

Talks presented at the LHC Collimation Working Group.

Talks presented at the BI Technincal Board

Date

 Topic

 Remarks

12/01

Project thesis CFC (W. Friesenbichler) [doc, pdf]

 

05/02

Diplom thesis CFC (W. Friesenbichler) [pdf]

 

14/02/2003

 BLM Dependability 1 [pdf] (Gianluca Guaglio)

 Preliminary Reliability Considerations

18/03/2003

 BLM Threshold Comparator [pdf] (Christos Zamantzas)

 Preliminary Design Considerations

08/04/2003

 BLMlasermarket01o.pdf (Gianluca Guaglio)

 Transmitter/Receiver first market survey

10/06/2003

 BLMTC Post Mortem & Memory Requirements [pdf] (Christos Zamantzas)

 Still to be checked for consistency. For more info check LHC Post-Mortem Home Page

12/08/2003

 BLM Threshold Comparator [pdf] (Christos Zamantzas)

 Latest TC design & Memory calculations.

23/09/2003

 BLM Design Issues [pdf] (Christos Zamantzas)

 Storage of Th values, Beam energy, Status bits, Identification and installation procedures. 

21/10/2003

 BLM_031021 (Gianluca Guaglio)

 H6 and Louvain measurements.

21/10/2003

 BLMTC Logging & Post Mortem  [pdf] (CZ)

 Design strategy for log and PM data.

19/11/2003

Beam Loss Monitors (E.B. Holzer for the BLM team)

AB-LTC Technical Review

22/02/2004

The Beam Loss Monitoring System(B. Dehning for the BLM team)Paper, Talk

Chamonix talk on the commissioning and running in of the system + SPS test results and collimation features

02/2004

Section review meeting. Dependability + irrradiations. Slides

Guaglio's speeches on Dependability of BLM, Radiation test on analog part, poposed test on analog electronic, dump levels approximations.

05/2004

BIW2004 (Gianluca Guaglio)

Contribution to the Beam Instrumentation Workshop: Paper and Slides

09/07/2002

LEADE (B. Dehning)

Working group talk

14/06/2004

LEADE (B. Dehning

Working group talk

20/11/2003

Specification comments (D. Dehning)

BI TB

07/2004

Longitudinal Loss Distribution, paper, poster. (E.B. Holzer, B. Dehning)

EPAC 04

07/2004

Design of the BLM System for the LHC, paper, poster. (E.B. Holzer et al.)

EPAC 04

07/2004

Beam Loss Monitoring System, slides. (E.B. Holzer)

External Review of LHC Collimation Project

07/2004

Beam Loss Monitors for the LHC, slides. (E.B. Holzer)

LHC Specification Committee

10/2004

ICFA2004 (G. Guaglio)

Contribution to the ICFA-HB2004 workshop: Article and Slides

11/2004

Radiation day 2004, CERN, (B.Dehning)  (slides)

LHC BLM system

03/2005

Quench level work shop, CERN, (B.Dehning) (slides)

LHC BLM system

04/2005

Machine protection review, CERN, (B.Dehning) (slides), (recommendation, slides, paper)

LHC BLM system

05/06/05

DIPAC,  (B.Dehning), (slides, paper)

 LHC BLM system

05/06/05

DIPAC, C. Zamantzas, (poster, paper)

The LHC Beam Loss Monitoring System’s Real–Time Data Analysis Card

06/2005

PAC, R. Filippini at. al, (doc, pdf)

RELIABILITY ASSESSMENT OF THE LHC MACHINE PROTECTION SYSTEM

10/2005

Beam Loss Monitoring System for the LHC, E.B. Holzer et al. (presentation, paper)

IEEE NSS 2005

29/12/05

Radiation Day CERN, B. Dehning (ppt)

LHC Beam Loss System (HERA dump)

14/12/05

Interpretation and Use of BLM Data, LTC (ppt)

 

16/12/05

PhD Gianluca Guaglio (Presentation.ppt, Thesis.pdf)

BLMS Dependability

05/02/06

 Chamonix VX, 2006, B. Dehning, (ppt, paper)

BLM commissioning

06/02/06

Chamonix VX, 2006 BI , E,B, Holzer (presentation, paper)

Group Commitments and Major Issues for Distributed Systems

06/04/06

AB seminar, Reliability study of the BLM system, (pdf)

G. Guaglio

01/06/06

ICFA Tsukuba 2006,  E,B, Holzer (presentation, paper)

Commissioning and operational scenarios of LHC BLM system

1/8/2006

Overview Machine Protection, Schmidt et al. [pdf]

New Journal of Physics 8 (2006) 290

17/09/06

OEPG-FAKT 2006, M. Stockner (presentation) (german)

Messungen und Simulationen für das Strahlverlust-Monitor-System des LHC

15/09/06

LECC, E. Effinger (talk, paper)

The LHC beam loss monitoring system’s data acquisition card

15/09/06

LECC, J. Emery (poster, paper)

Functional and Linearity Test System for the LHC Beam Loss Monitoring Data Acquisition Card

15/09/06

LECC, C.. Zamantzas (poster, paper)

The LHC Beam Loss Monitoring System’s
Surface Building Installation

05/10/06

Siena IPRD06, D. Kramer (presentation, paper)

Simulations & beam tests of SEM (BLMS)

30/10/06

IEEE NSS-MIC 2006, M. Stockner (poster, paper), San Diego

Measurements and Simulations of Ionization Chamber Signals in Mixed Radiation Fields for the LHC BLM System

30/10/06

IEEE NSS-MIC 2006, C. Zamantzas, (poster, paper), San Diego

An FPGA Based Implementation for Real-
Time Processing of the LHC Beam Loss
Monitoring System’s Data

 

 

 

7/12/06

MAC, R. Jones (pdf)

Status on beam instrumentation (status BLM)

9/3/07

MPWG, L. Ponce (presentation)

Remote setting of LHC BLM thresholds?

20/05/07

DIPAC, E. Effinger (poster (pdf, odp), paper)

Single Gain Radiation Tolerant LHC Beam Loss
Acquisition Card

23/5/07

DIPAC07, M. Stockner, E.B. Holzer (poster, paper)

Classification of the LHC BLM Ionization Chamber

June 2007

PAC 2007, E.B. Holzer (poster (pdf, odp), paper)

The LHC Beam Loss Measurement System

June 2007

PAC 2007, M. Stockner, D. Kramer. (poster (pdf, odp), paper)

LHC Beam Loss Detector Design: Simulations and Measurements

10.2007

PhD Thesis, M. Stockner (pdf)

Beam Loss Calibration Studies

for High Energy Proton Accelerators

18/10/07

CLIC workshop, E.B. Holzer (presentation)

Machine Protection system: Lessons learnt from LHC

2/11/07

IEEE NSS 2007, D.Kramer (presentation, paper)

Very High Radiation Detector for the LHC BLM System Based on Secondary Electron Emission

2/11/07

IEEE NSS 2007, C.Zamantzas (presentation, paper)

The LHC Beam Loss Monitoring System's
Data Contribution to other Systems.

2/11/07

IEEE NSS 2007,  E.B. Holzer (poster, paper)

Accuracy of LHC proton loss rate determination by the BLM system

15/11/07

PS test measurements with IC (ppt)

BI TB, V. Prieto

18/12/07

Steffen Mueller (CMS); Neutron Beam measurement (pdf), Electron Beam Measurement (pdf)

CMS Beam Condition Monitor; Neutron Beam Test of Ionization Chambers Response; electron beam measurements

30/1/08

LTC, L. Ponce (pdf)

Commissioning of the LHC Beam Loss Monitor System

02/08

J. Emerry (presentation)

Combiner and Survey Card

02/08

M. Sapinski, (pdf, doc)

Database specification

18/02/2008

T. Boehlen (pdf)

Calibration studies at the SPS LHC collimator

18/02/2008

D. Kramer (pdf)

Results of the BLM hardware tests in LSS5

5/3/08

LTC extended, L. Ponce (presentation)

 

11/04/2008

APC, T. Boehlen (pdf) (pdf)

LHC collimator measurements in the SPS

11/04/2008

APC, D. Kramer (pdf)

BLM electronics tests, and ionisation chamber SEM comparison

 01/05/2008

ESREL, S. Wagner (pdf)

Balancing safety and availability for an electronic protection system

05/05/2008

BIW08, B. Dehning (presentation (pdf, ppt), paper (pdf, doc))

LHC machine protection

06/05/2008

SBWG meeting on CNGS beam performance; A. Marsili (pdf)

Behaviour of CNGS Muon Detectors

24/05/2008

D. Kramer (ppt)

TI8 Injection test

23/06/2008

E.B. Holzer et al. (pdf)

Generation of 1.5 Million Beam Loss Monitor Settings

23/06/2008

E.B. Holzer et al. (pdf)

Development, Production and Testing of 4500 Beam Loss Monitors

10//09/2008

D. Kramer (PhD. Thesis pdf)

Design and Implementation of a High Flux Mixed Radiation Field Detector

 

A. Priebe (project report pdf)

Geant4 simulation of MB to MQ interconnection

23/09/2008

T. Boehlen (pdf)

Thesis: Beam Loss Patterns at the LHC Collimators

11/2008

T. Boehlen (pdf)

Thesis: Talk Beam Loss Patterns at the LHC Collimators

17/12/2008

T. Boehlen (pdf)

Collimation: Beam Loss Patterns at the LHC Collimators

17/12/2008

M. Sapinski (pdf)

BLM thresholds for LHC collimators

01/2009

B. Roderik, D. Bocian (ppt)

Bound Free Pair Production, ion, quench at LHC

2//3/2009

M. Sapinski (pdf)

BLM quench threshold estimates on the MB magnet

6/3/2009

B. Dehning (ppt)

LHC Risk Review, Beam Loss Monitor System Reliability and False Signals

4/05/2009

B. Dehning et al. (poster (pdf, odp), paper (pdf))

PAC09: First Experience with the LHC BLM system

4/05/2009

T. Boehlen et al. (poster (pdf, odp), paper (pdf))

PAC09: Energy deposition simulations and measurements of a LHC collimator in the SPS

03/06/2009

E.B. Holzer (ppt)

CLIC instrumentation workshop, CDR preparation

25/05/2009

Summary web page [html]

Contributions to DIPAC 2009 related to Beam LossMonitoring

25/05/2009

Summary web page [html]

Contributions to DIPAC 2009 related to Wire Scanners

12/06/2009

C. Zamantzas [pptx, pdf]

BI seminar: “Highlights from DIPAC09”

06/08/2009

M. Brugger [ppt]

Busbar quench simulations

30/09/2009

D. Kramer [ppt]

CNGS radiation tests BLM, BPM and others

19/01/2010

C. Zamantzas [pdf]

BLM status

25/01/210

E.B. Holzer [talk: pdf, paper: pdf]

BLM status

12/05/2010

E. Griesmayer [pdf]

Diamond BIW10 paper

09/04/2010

Csaba Hajdu [pptx]

Test of threshold comparator firmware

18/06/2010

B. Dehning [pptx]

MPS internal review

10/08/2010

A. Nordt [pdf, sxi]

fast evemts, post mortem data analysis, MPP

17/08/2010

A. Nordt [pdf, sxi]

fast evemts, post mortem data analysis, LCCWG

17/08/2010

C. Zamantzas [pdf]

Firmware upgrade

06/09/2010

B. Dehning [pptx]

MPS external review

06/09/2010

B. Holzer [pdf, ppt]

MPS extrenal review

08/09/2010

B. Dehning [ppt]

quench level test (LMC foresen, before MP3 and MPP meetings)

24/082010

J. Emmery [poster,pdf]

Modulation of high volatge, TWEPP

26/08/2011

W. Vigano [pptx]

CERN injector analog electronic design

27/06/2014 E. Nebot [pdf] oPAC BLM talk

 


 

Return to Main Page

 

Number of hits:
Updated on 09/11/2010.
Send your comments and suggestions concerning this page to Christos Zamantzas.